RoofBot - Roof Calculator Roof-bot calculator
Need help? Call us on 01494 461711
Free delivery & toolkit

on orders over £250 ex VAT

20 year warranty
Life expectancy

free downloadable warranty

Secure payments

Encrypted With SSL

Under Tiles

Step by step guide on installing our Firestone EPDM membrane under tiles/sales for your next rubber roofing project.

Download PDF
Step 1

Carefully remove tiles and battens and place to one side.

Step 2

Fold the felt underlay up and tuck under existing tiles.

Step 3

Apply a thin coat of contact adhesive to the rubber membrane and lay board.
Shop EPDM Adhesives

Step 4

Allow both surfaces to dry and, starting from the bottom, mate together, working the rubber into any angle changes.

Step 5

Reinstate the felt underlay and battens over the rubber.

Step 6

Reinstall the tiles.

Roofus, your friendly roof assistant

Looking for help or advice?

Click on our friendly RoofBot to help you work out what you need for your DIY Firestone RubberCover project, just input your dimensions, answer some simple questions and let RoofBot do the rest. If you still need assistance, don't hesitate to contact us on LiveChat, info@rubba-seal.co.uk or 01494 461711.

Get in touch RoofBot - Roof Calculator

© 2021 Avenir Roofing Ltd t/a Rubba-Seal   •  All rights reserved
Registered in England and Wales: 04710777  •  
VAT registration number: 527 2382 48

Web design & development by Fifty Digital Logo